Road Line Marking

Hampshire · South East

Road Line Marking in Andover

Crews covering Andover handle everything from a single give-way line to long runs of machine-applied centre line.

Mark your new estate roads in Andover.

Free Road Line Marking quote in Andover

No obligation. We only use your details to reply about this job.

Where we work around Andover

Andover falls within Hampshire, South East. Jobs here are mostly in the SP10 and SP11 postcode areas. The same team covers East Anton and Picket Piece too.

Road Line Marking in Andover: local know-how

Business parks near Andover often re-line roads during quiet weekends to avoid disrupting staff and deliveries. Estate roads around Andover often need centre lines, junction markings and speed hump markings refreshed together in one visit.

Clay soils across much of the South East move with the seasons, which affects anything built into the ground, from walls and bases to drainage. Older streets in Andover are often narrow with on-street parking, so marking work needs clear notices and careful traffic control.

Typical costs in Andover

  • Machine-applied white line (100 mm): £1.20–£3 per linear metre. Centre and edge lines on longer runs; short runs and hand-laid lines cost more.
  • Minimum mobilisation charge: from £450. Covers crew, boilers, vehicles and basic signing for small private road jobs.
  • Road studs supplied and fitted: £12–£30 each. Depends on stud type, quantity and whether old studs need removing.

Prices are a guide. Your quote for Andover is a fixed price based on the details you give us. Full price guide.

Road Line Marking questions from Andover

How much does road line marking cost in Andover?

Machine-applied white lines typically cost £1.20 to £3 per metre, with yellow lines around £3 to £7 per metre. Junctions and symbols are priced individually. Crews covering Andover will give a quote once they know the lengths, layout and traffic management needed.

How do I get a road marking quote in Andover?

Send us your road location in Andover, the markings needed and any drawings or photos through our quote form. A local crew will review the details and send a quote.

How long will road marking take in Andover?

Most private road jobs in Andover are completed in a single shift. Public road work depends on permits and traffic management, which can take weeks to arrange before the work itself.

Do you cover roads near Amesbury as well as Andover?

Yes. Our network covers Andover, Amesbury, Romsey and the wider the South East area. Combining jobs in nearby locations can reduce mobilisation costs.

What do the different road line colours mean?

White lines guide and separate traffic and show junctions, lanes and hazards. Yellow lines show waiting and loading restrictions, and yellow box junctions must be kept clear. Red routes in some cities use red lines for stopping controls. Road studs use white, red, amber and green to show lane and edge positions.

How long does road line marking take?

A crew can machine-line several kilometres of centre line in a shift on a closed road, and a typical junction takes a few hours. Setting up traffic management often takes as long as the marking itself. Thermoplastic cools within minutes, so roads can reopen quickly.

Get a free road line marking quote in Andover

Tell us what you need and we'll come back with a clear price.

Request a quote