Leeds · Yorkshire and the Humber
Road Line Marking in Yeadon
Road markings in Yeadon take heavy wear from braking and turning traffic, and properly applied thermoplastic lasts for years.
Where we work around Yeadon
We cover all of Yeadon and the wider Leeds area. That includes the LS19 and LS20 postcode districts. We also take jobs in Baildon, Guiseley, Rawdon, Menston and Burley in Wharfedale.
Road Line Marking in Yeadon: local know-how
Hilly streets in many West Yorkshire towns make access and parking an important part of planning any job. Older road surfaces in Yeadon can be patched and uneven, which affects how well markings bond and how long they last.
Worn rural road surfaces near Yeadon sometimes need patching before markings go down, so crews check condition first. Rural lanes and private estate roads near Yeadon benefit from edge lines and road studs where there is no street lighting.
What we can do in Yeadon
Junction Markings and Hatching
Give-way and stop lines, chevron hatching, ghost islands, keep-clear boxes and yellow box junctions laid by hand screed.
Longitudinal Lines and Edge Lines
Centre lines, lane lines, edge lines and hazard warning lines applied by machine for long, even, reflective runs.
Traffic Management for Lining Works
Signing, lighting and guarding, lane closures and mobile works to keep crews and road users safe during marking.
Road Studs and Reflective Markers
Installation and replacement of reflective road studs to improve lane guidance on dark, wet or rural roads.
Text, Symbols and Coloured Surfacing
SLOW, BUS STOP, cycle symbols, speed limit roundels, red and buff anti-skid surfacing and coloured cycle lanes.
Yellow Lines and Restriction Markings
Single and double yellow lines, kerb blips, loading bays and bus stop clearways to support parking and loading restrictions.
Typical costs in Yeadon
- Road studs supplied and fitted: £12–£30 each. Depends on stud type, quantity and whether old studs need removing.
- Preformed text or symbol: £40–£150 each. SLOW, BUS STOP, cycle symbols and roundels, priced by size and complexity.
- Give-way or stop junction: £150–£400 per junction. Lines and triangle or STOP text, depending on road width and design.
Prices are a guide. Your quote for Yeadon is a fixed price based on the details you give us. Full price guide.
Road Line Marking questions from Yeadon
How long will road marking take in Yeadon?
Most private road jobs in Yeadon are completed in a single shift. Public road work depends on permits and traffic management, which can take weeks to arrange before the work itself.
Do you work at night in Yeadon?
Yes. Night working is common for busy roads in Yeadon to reduce disruption. Crews use lighting and plan noisy work carefully near homes.
Who do I contact about faded road markings on a public road in Yeadon?
Report faded or missing markings on public roads to Leeds, which is usually the highway authority. Private contractors cannot mark public roads without the authority's approval.
How do I get a road marking quote in Yeadon?
Send us your road location in Yeadon, the markings needed and any drawings or photos through our quote form. A local crew will review the details and send a quote.
What is a hazard warning line?
A hazard warning line is a centre line with long dashes and short gaps, warning drivers of a hazard ahead such as a bend, junction or narrowing. It tells drivers not to overtake unless they can see the road is clear well ahead, unlike a solid line, which prohibits crossing.
Do private roads need to follow road marking rules?
Private roads are not legally bound by the Traffic Signs Regulations, but most owners follow the same designs so drivers understand them. If a private road is intended for adoption by the council, it must be marked to the adopting authority's standards.
Helpful guides
Can You Paint Yellow Lines on a Private Road?
Yes, a landowner can mark yellow lines on a genuinely private road, but they do not carry the same legal force as council yellow lines. On…
Read the guide →Traffic Management for Road Marking: What Is Needed?
Road marking on public roads needs temporary traffic management planned to the Safety at Street Works and Road Works code of practice or…
Read the guide →Get a free road line marking quote in Yeadon
Tell us what you need and we'll come back with a clear price.
Request a quote